Use Progress Field in 4 how-to topics, covering field creation, percentage entry, drag adjustment, and calculations; choose a topic from the index and follow the steps.
How-to Index
| No. | Topic | Membership Requirement |
|---|---|---|
| 1 | 1. Create a Progress Field | Free |
| 2 | 2. Enter a Progress Percentage | Free |
| 3 | 3. Drag the Progress Bar to Adjust Completion | Free |
| 4 | 4. Use Progress Field in Calculations | Free |
How-to Guide
1. Create a Progress Field
Entry: + button on the right side of the header → field type list → Progress
- Open the Smart Table data sheet you want to edit.
- Click the + button on the right side of the header.
- In the field type list, select Progress.
- Enter a field name.
- Click Confirm to finish creating the field.
Success Criteria
- Interface result: A new Progress Field column appears in the table.
- What you can do next: You can type percentages or drag the progress bar in that column.
Tips While Using
- Use a clear field name such as Completion or Project Progress.
- Progress Field is intended for values between 0% and 100%.
2. Enter a Progress Percentage
Entry: target cell → type a percentage directly
- Click the target cell in the Progress Field column.
- Type a percentage value such as 60%.
- Press Return or finish the input.
- Check the progress display in the cell.
Success Criteria
- Interface result: The cell shows the percentage and matching progress fill.
- What you can do next: You can continue updating progress values for other records.
Tips While Using
- Keep the same percentage format across records for easier comparison.
- Keep values within the 0% - 100% range.
3. Drag the Progress Bar to Adjust Completion
Entry: target cell → drag the progress bar
- Click the target cell in the Progress Field column.
- Find the adjustable progress bar inside the cell.
- Drag the bar left or right.
- Release the mouse to keep the current completion value.
Success Criteria
- Interface result: The bar length changes with the drag position.
- What you can do next: You can fine-tune the value until it matches the target completion level.
Tips While Using
- Dragging is useful for quick status updates.
- If you need an exact value, combine dragging with direct percentage input.
4. Use Progress Field in Calculations
Entry: reference the Progress Field in a formula or summary workflow
- Make sure the Progress Field already contains valid percentage data.
- Choose the formula or summary method you want to use.
- Reference the Progress Field as a numeric field in sum, average, or similar calculations.
- Review the result and confirm that it matches your expectation.
Success Criteria
- Interface result: The calculation returns a usable numeric result.
- What you can do next: You can continue with filtering, grouping, or summary analysis.
Tips While Using
- Progress Field is stored as a numeric value and can be used in common numeric calculations.
- Consistent input formatting helps keep summary results more reliable.