Use WPS Progress Field with 2 how-to topics, including creating a progress field and setting a progress value; 2 items are available without membership and 0 items are membership-related.
How-to Index
| No. | Topic | Membership Requirement |
|---|---|---|
| 1 | 1. Create a Progress Field | Free |
| 2 | 2. Set a Progress Value | Free |
How-to Guide
1. Create a Progress Field
Entry: + on the right side of the table header → field type list → Progress
- Click the
+button on the right side of the table header. - In the field type list, select
Progress. - Enter a field name.
- Click
OKto finish.
Success Criteria
- Interface result: a new progress field column appears in the table.
- What you can do next: you can enter or adjust percentages in cells under this field.
Tips While Using
- Common mistake: if you are not in the correct table first, you may add the field to a different table.
- Environment note: you need edit permission for the current multi-dimensional table.
2. Set a Progress Value
Entry: target cell → enter a percentage or drag the progress bar
- Click the target cell in the progress field.
- Enter a percentage value, such as
60%. - Or drag the progress bar to adjust completion.
- Check that the bar fill changes with the current value.
Success Criteria
- Interface result: the cell shows the percentage and the bar fill changes with the value.
- What you can do next: the field remains available for later review and updates.
Tips While Using
- Common mistake: use percentage-style input so the completion value is easier to read.
- Environment note: the valid range for the progress field is 0% to 100%.