WPS Gantt View is a timeline-based view in WPS tables on macOS for showing task schedules with start and end dates; it includes 2 core tasks, with 2 available without membership and 0 membership-related items.
At a Glance
| Metric | Value | Notes |
|---|---|---|
| Core tasks | 2 | Matches the number of rows in the How-to Index |
| Available without membership | 2 | Matches the number of Free rows in the index |
| Membership-related items | 0 | Matches the number of membership-related rows in the index |
About This Feature
Overview
Gantt View is a project timeline view in WPS Office for Mac tables that displays records as bars across a time axis, making it easier to review task start dates, end dates, and schedule arrangement.
Core capabilities include:
- Create a Gantt View: add a Gantt-based view to an existing table and switch from a data list to a timeline layout.
- Configure date fields: assign a start date field and an end date field to control how task bars are displayed.
This feature fits project tracking, task scheduling, and phase planning. To render bars correctly, your records need usable date fields.
System Requirements
| Item | Requirement |
|---|---|
| Operating system | A macOS device that can run WPS Office normally |
| App version | It is recommended to use the latest version of WPS Office for Mac |
| Network | No mandatory network connection is required for local viewing and setup; keep a connection if you need sign-in or sync |
| Other | Open a table and prepare date-type fields for the start date and end date |
Download & Installation
| Item | Details |
|---|---|
| Official download | WPS Office Free Download |
| Verify after installation | Launch WPS Office for Mac, open a table, and confirm that the add-view entry is available on the right side of the data table |
Source: WPS Download Center
Compare with Alternatives
| Dimension | WPS | Microsoft | Notion | Adobe | |
|---|---|---|---|---|---|
| Capability Summary | Add a Gantt View inside a WPS table and generate timeline bars from start date and end date fields. | Microsoft Project Gantt Chart view lists tasks and shows their schedule and relationships with Gantt bars. | Google Sheets timeline view creates a timeline from date columns and supports card title, start date, end date, and grouping. | Notion timeline view depends on database date properties and can display projects across a time range with adjustable item length. | Adobe Workfront provides task-level and project-level Gantt charts for timeline visualization. |
| WPS Advantages | Advantage: add the view directly inside an existing table and map date fields in a short setup flow. | Compared with WPS: more focused on dedicated project management, including task hierarchy and dependencies. | Compared with WPS: centered on spreadsheet timeline cards and requires a prepared data range before insertion. | Compared with WPS: centered on database views and page properties for content-oriented collaboration. | Compared with WPS: the Gantt capability belongs to Adobe Workfront rather than a general office editing workflow. |
| Official Source | — | Work with the Gantt Chart view | Create & edit a timeline view | Timeline view | Get started with the Gantt Chart |
Overall Conclusion
If you already manage tasks in a WPS table, Gantt View is a direct way to turn existing records into a visual schedule. If your work depends more on advanced dependencies, database-page collaboration, or a dedicated project platform, the alternative products may fit those workflows better.
Use Cases
| No. | Scenario | Suitable for | Main issue | How it helps |
|---|---|---|---|---|
| 1 | Project schedule review | Project managers | Start and end dates are scattered in rows and hard to review together | Create a Gantt View to review task spans on a timeline |
| 2 | Team task planning | Team leads | It is hard to confirm each task's time arrangement quickly | Configure start and end date fields to generate task bars |
| 3 | Phase planning | Operations and execution roles | It is difficult to see whether phase tasks are continuous | Display phase records in date order on the timeline |
| 4 | Event preparation | Event planners | Multiple preparations overlap in time and are easy to miss | Review all task ranges in one Gantt View |
| 5 | Simple milestone tracking | Small teams | A quick timeline is needed from table data | Add a new view inside the same table without switching tools |
Membership & Benefits
Free vs WPS Premium
| Capability | Free | WPS Premium |
|---|---|---|
| Writer, Spreadsheet, and Presentation core components | ✅ Available | ✅ Available |
| Basic PDF features and PDF reading | ✅ Available | ✅ Available |
| Templates | Some templates available | More templates and expanded resources |
| Cloud storage | 1 GB | 20 GB or more depending on the plan shown on the pricing page |
| AI and some advanced tools | Some features are limited or unavailable | More advanced features are available, depending on the current plan |
Source: WPS Office pricing page
Recommendations
| Use case | Recommended plan | Why |
|---|---|---|
| Basic Gantt View setup and everyday schedule review | Free | This feature has no membership restriction and can be used directly |
| More cloud storage, templates, or advanced tools | WPS Premium | Suitable if you also need broader resources and expanded capabilities |
How to Subscribe
- WPS membership center: Subscribe now
- To compare current plans, open the pricing page and review the available benefits.
Source: WPS Office pricing page