WPS Gantt View Grouping on iOS helps organize DBSheet task bars by field values; 3 core tasks are included, with 3 available without membership and 0 membership-related items.
At a Glance
| Metric | Value | Notes |
|---|---|---|
| Core tasks | 3 | Matches the number of rows in the How-to Index |
| Available without membership | 3 | Matches the number of Free rows in the index |
| Membership-related items | 0 | Matches the number of membership-related rows in the index |
About This Feature
Overview
Gantt View Grouping is a built-in DBSheet capability in WPS Office for iOS that helps you organize project tasks in a Gantt view by grouping task bars based on selected field values.
Core tasks include:
- Add a group: choose a field and create a grouped task structure for faster project review.
- Expand or collapse a group: switch between a compact summary and full task details inside each group.
- Remove a group: clear the current grouping condition and return to the default order.
This feature is useful for project scheduling, phase-based reviews, and progress checks by owner or status. Grouping changes how tasks are displayed, but it does not change the timeline or task dates.
System Requirements
| Item | Requirement |
|---|---|
| OS | An iPhone or iPad that can run iOS or iPadOS normally |
| App version | It is recommended to use the latest version of WPS Office |
| Network | A network connection is recommended when opening an online DBSheet or syncing data |
| Other | You need access to a DBSheet that contains a Gantt view and the required permission to view or edit the related data |
Download & Installation
Before using Gantt View Grouping, install WPS Office on your iOS device and sign in with an account that can access the target DBSheet.
| Item | Notes |
|---|---|
| Official Download | WPS Office Free Download |
| Post-install Check | Open WPS Office, enter a DBSheet Gantt view, and confirm that the Tools and Group options are available |
Source: WPS Download Center
Compare with Alternatives
| Dimension | WPS | Microsoft | Notion | Adobe | |
|---|---|---|---|---|---|
| Capability Summary | In the DBSheet Gantt view on iOS, WPS can group task bars by field values and supports expanding, collapsing, and removing groups. | Microsoft Project can group tasks in task views such as Gantt Chart by one or multiple criteria and can return the view to No Group. | Google Sheets timeline view can place multiple cards on the same row with Card group, and the timeline can be viewed on Android or iOS after setup. | Notion Timeline can group entries by a property and combine grouping with sub-items and dependencies for project planning. | Adobe Workfront Gantt keeps list-level grouping when viewing or exporting the Gantt chart and lets users work with grouping applied above the chart. |
| WPS Advantages | Advantage: The grouping flow is available directly in the iOS Gantt view, including add, expand or collapse, and remove actions for quick mobile review. | Compared with WPS: Official guidance focuses on Project desktop task views, so the mobile path is less direct than the WPS iOS flow. | Compared with WPS: Timeline grouping depends on prepared source columns, and creation or configuration is mainly done on a computer. | Compared with WPS: Grouping is flexible, but it depends on database property setup rather than a lightweight spreadsheet-style Gantt entry point. | Compared with WPS: The official workflow is centered on Workfront project management and export scenarios, where grouping follows the existing list setup. |
| Official Source | — | Group tasks or resources in Project | Create and edit a timeline view in Google Sheets | Intro to Timeline view in Notion | Export the Gantt Chart to PDF in Adobe Workfront |
Overall Conclusion
WPS Gantt View Grouping is well suited to mobile project review on iOS because the grouping controls are available directly inside the Gantt view. Other products also provide grouping or timeline organization, but their setup paths and product focus differ.
Use Cases
| # | Scenario | Target Users | Core Pain Point | Solution |
|---|---|---|---|---|
| 1 | Review schedules by task status | Project managers | It is hard to separate not started, in progress, and completed tasks in a busy timeline | Add grouping by the status field in the Gantt view |
| 2 | Check progress by owner | Team leads | It takes time to see how tasks are distributed across team members | Group by owner and collapse unrelated groups |
| 3 | Organize work by phase | Project members | Multi-phase projects can look crowded in one timeline | Group by phase and expand the phase you want to review |
| 4 | Focus on priority work temporarily | Reviewers | Other records can distract from the tasks that matter right now | Collapse non-priority groups and keep the target group expanded |
| 5 | Return to the default layout for editing | Daily maintainers | After grouped review, users may need the original order again | Remove the grouping condition and continue working in the default layout |
Membership & Benefits
Free vs WPS Premium
| Feature | Free User | WPS Member |
|---|---|---|
| Gantt View Grouping | ✅ Available | ✅ Available |
| Basic PDF features | ✅ Available | ✅ Available |
| Templates and cloud storage extensions | Some limits apply | More extended benefits and storage are available |
| Some advanced tools and value-added features | Depends on the specific feature | Broader access is typically available |
Source: WPS Office pricing page
Recommendations
| Use Case | Recommended Plan | Reason |
|---|---|---|
| You mainly use DBSheet Gantt view grouping for daily review and organization | Free | This feature can be used without a membership requirement |
| You also need more templates, cloud storage, or other extended capabilities | WPS Member | A membership is more suitable when you use additional value-added features across WPS Office |
How to Subscribe
- WPS membership center: Subscribe now
Source: WPS Office pricing page