WPS Progress Field on Windows FAQ

Last updated:July 24, 2026

When using Progress Field, common questions usually focus on field creation, value entry, and later calculations; this FAQ includes 3 common questions and a short glossary.

FAQ

Can a Progress Field be used in average calculations?

  1. Yes. The Progress field stores numeric values.
  2. In calculation scenarios, it can be included in sums, averages, and similar numeric operations.
  3. The result can then be used to review overall completion.

Can I adjust the Progress Field by dragging?

  1. Yes. Open the target cell and drag the progress bar directly.
  2. As you drag, the completion value updates based on the current position.
  3. After adjustment, you can immediately review the new percentage display.

Why can’t I find the Progress Field option?

  1. First confirm that you are working in an editable multidimensional table.
  2. Check whether you have permission to add fields or edit the table structure.
  3. If the option is still unavailable, update WPS Office and reopen the multidimensional table to check the field type list again.

Glossary

TermDefinition
Progress FieldA field type in multidimensional tables that shows completion with percentages and a progress bar.
PercentageA numeric percentage value used to represent the current completion level of a task or project.
Data BarA visual method that uses bar length to show numeric size, often used for progress or comparison.