FAQ

Can the Progress Field be used in average calculations?

  1. Yes.
  2. The Progress Field stores numeric values, so it can be included in calculations such as sum and average.
  3. This is useful when you want to measure overall completion across multiple records.

Can I review records by progress value?

  1. Yes.
  2. You can combine the field with filtering and grouping to review records at different completion levels.
  3. This makes it easier to find unfinished, in-progress, or nearly completed work.

Why does the progress bar change when I edit the value?

  1. The bar fill updates automatically according to the percentage value in the cell.
  2. When the value changes, the visible bar length changes with it.
  3. For accurate display, keep the value within the 0% - 100% range.

Glossary

TermDefinition
Progress FieldA table field type that shows completion with both a percentage and a visual bar.
PercentageThe numeric format used to represent completion, usually between 0% and 100%.
Progress barA visual bar that fills according to the stored value to show current completion.