Use WPS Gantt View on Windows with 3 how-to topics, including 3 free topics and 0 membership-related items; choose a topic from the index and follow the entry path and steps below.
How-to Index
| No. | Topic | Membership Requirement |
|---|---|---|
| 1 | 1. Create a Gantt view | Free |
| 2 | 2. Configure the start date field and end date field | Free |
| 3 | 3. Check Gantt bar display conditions | Free |
How-to Guide
1. Create a Gantt view
Entry path: Data table → “+” icon → Gantt View
- Open the target multidimensional table and go to the data table you want to review.
- Click the “+” icon on the right side of the data table.
- Select “Gantt View” from the available view options.
- Open the new Gantt view and get ready to configure its fields.
Success Criteria
- Interface result: a Gantt view appears in the view list.
- Next action available: you can click Gantt configuration to continue setting date fields.
Tips While Using
- Common mistake: if you do not click the “+” icon on the right side of the data table, you may not enter the add-view flow.
2. Configure the start date field and end date field
Entry path: Gantt View → Gantt configuration
- In the Gantt view you created, click “Gantt configuration.”
- Find the Start date field setting.
- Select a date-type field as the start date field.
- Find the End date field setting.
- Select a date-type field as the end date field.
Success Criteria
- Interface result: both the start date field and end date field appear as selected.
- Next action available: the view can try to render Gantt bars from the selected date fields.
Tips While Using
- Common mistake: choosing a non-date field can prevent the chart from displaying correctly.
- Environment limit: both the start date field and end date field must be date-type fields.
3. Check Gantt bar display conditions
Entry path: Gantt View → review the timeline display
- Confirm that the data table already contains date values.
- Check whether both the start date field and end date field are configured correctly.
- Verify that each task’s start date is earlier than its end date.
- Return to the Gantt view and check whether the task bars display normally.
Success Criteria
- Interface result: tasks that meet the conditions appear as timeline bars.
- Next action available: you can continue reviewing task spans and schedule progress.
Tips While Using
- Common mistake: without date data, the Gantt chart cannot render.
- Common mistake: if the start date is later than the end date, the Gantt bar will not display.