Gantt View Add and Delete Records in WPS on Android: Introduction

Last updated:July 22, 2026

Gantt View Add and Delete Records in WPS on Android helps you maintain project items in a multidimensional table timeline; this guide covers 3 core tasks, with 3 available without membership and 0 membership-related items.

At a Glance

MetricValueNotes
Core tasks3Matches the number of rows in the How-to Index
Available without membership3Matches the number of Free rows in the index
Membership-related items0Matches the number of membership-related rows in the index

About This Feature

Overview

Gantt View Add and Delete Records is a task-maintenance feature in WPS Office for Android within a multidimensional table. It helps you add new records from the Gantt view, remove records you no longer need, and keep the project timeline updated on mobile.

Core tasks include:

  • Add a record from the bottom toolbar for quick task entry while viewing the chart.
  • Add a record from the lower-left area of the timeline when you want to continue entering nearby tasks.
  • Delete a record from its detail page when a task was created by mistake or is no longer needed.

This feature is useful for project schedule updates, task backfilling, and timeline cleanup. It reduces switching between the Gantt view and other table views, and it helps new or deleted task bars reflect on the timeline more directly.

System Requirements

ItemRequirement
Operating systemAndroid phone or tablet
App versionIt is recommended to use the latest version of WPS Office
NetworkA network connection is recommended when opening online multidimensional tables or syncing team data
OtherYou need access to a multidimensional table that contains a Gantt view and the permission to view or edit related records

Download & Installation

ItemDetails
Official downloadWPS Office Free Download
InstallationInstall WPS Office on your Android device, sign in, and open your multidimensional table
Post-install checkOpen WPS Office, enter the Gantt view, and confirm that you can see an Add Record entry or a record detail entry

Source: WPS download center

Compare with Alternatives

DimensionWPSMicrosoftGoogleNotionAdobe
Capability SummaryOn Android, WPS lets you add records directly in a multidimensional table Gantt view and delete records from the record details page. New task bars appear on the timeline after creation.Microsoft Project officially documents adding tasks and continuing task management in Gantt-related project workflows. Public guidance for similar flows is more focused on desktop or web.Google Sheets on Android supports adding or deleting rows and columns for spreadsheet maintenance, but it is not a native Gantt view workflow.Notion Timeline lets you add a timeline view to a database and adjust timeline items in a time-based database layout.Adobe offers adjacent capability mainly through Workfront, where users can update tasks in a task-list Gantt chart and delete tasks in project management workflows.
WPS AdvantagesAdvantage: Add and delete records directly inside the Android Gantt view. Distinct: Newly added records can appear as task bars on the same timeline view.Compared with WPS: official guidance is more centered on Project desktop or web task management.Compared with WPS: Google Sheets focuses on row and column maintenance rather than native Gantt task-bar actions.Compared with WPS: Notion focuses more on database timeline management, with editing and deletion tied to database structure.Compared with WPS: Adobe relies on Workfront for adjacent project-management capability rather than an Acrobat-based Gantt workflow.
Official SourceAdd new tasks in Microsoft ProjectAdd or move columns and cells on AndroidTimeline view in NotionUpdate information in the task list Gantt Chart

Overall Conclusion
If you want to maintain task records directly from a Gantt view on Android, WPS provides a more concentrated mobile workflow for adding and removing records in one place. Other products cover adjacent needs, but many of those flows are centered on desktop, general spreadsheet editing, or a separate project-management platform.

Use Cases

No.ScenarioSuitable ForMain NeedHow This Feature Helps
1Add missing tasks on the goProject managersA plan is missing tasks during travel or meetingsAdd a record directly in the Gantt view and fill in fields
2Remove duplicate tasksTeam leadsDuplicate or mistaken task bars appear in the chartOpen the record details page and delete the record
3Update schedules on siteExecution team membersTask lists need quick updates during live coordinationUse the Gantt view entry to create records quickly
4Review plan completeness on mobileCollaboratorsIt is hard to correct data in time when using only a phoneAdd more records from the lower-left timeline entry
5Clean up after a project phaseProject coordinatorsOld or invalid records need to be removedDelete records that are no longer needed from the detail page

Membership & Benefits

Free vs WPS Premium

CapabilityFree UsersWPS Premium
Add records in Gantt viewAvailableAvailable
Delete records in Gantt viewAvailableAvailable
Other advanced WPS capabilitiesSome advanced features may be limitedMore advanced capabilities and value-added services are available

Source: WPS Office pricing page

Recommendations

Usage ScenarioRecommended PlanWhy
You mainly need to add or delete records in Gantt viewFreeThis feature can be used directly for routine project maintenance
You also need broader advanced office featuresWPS PremiumSuitable when you also work with more advanced document, spreadsheet, PDF, or collaboration needs

How to Subscribe

Source: WPS Office pricing page