Use WPS Progress on Android with 2 how-to topics in smart spreadsheet data tables; 2 are available without membership and 0 are membership-related.
How-to Index
| No. | Topic | Membership Requirement |
|---|---|---|
| 1 | 1. Create a Progress Field | Free |
| 2 | 2. Enter Progress Status | Free |
How-to Guide
1. Create a Progress Field
Entry: Tap the header → Edit → Field Type → Progress
- Tap the header that you want to set.
- In the floating toolbar, tap Edit.
- In the field editing window, tap Field Type.
- Select Progress.
- Set the field name, then tap OK to finish.
Success Criteria
- On-screen result: A new Progress field column appears in the data table.
- What you can do next: You can enter or adjust progress values for records in that field.
Tips While Using
- Use a clear field name such as "Completion" or "Task Progress."
- You need edit permission for the current data table to change header fields.
2. Enter Progress Status
Entry: Tap the header → Edit → Progress field
- Tap the data table header or the related record area that contains the Progress field.
- In editing mode, enter a value in the Progress field, or drag the progress bar directly.
- After adjusting the progress, tap OK in the upper-right corner to save it.
Success Criteria
- On-screen result: The related record shows the updated progress bar length or value.
- What you can do next: You can continue updating progress for other records.
Tips While Using
- You can update progress either by typing a value or by dragging the progress bar.
- Confirm the change after editing so the latest adjustment is saved.