Use WPS Progress Field in Spreadsheet on Android with 2 how-to topics; both are available without membership and can be opened from the How-to Index.
How-to Index
| No. | Topic | Membership Requirement |
|---|---|---|
| 1 | 1. Create a Progress Field | Free |
| 2 | 2. Update Progress Status | Free |
How-to Guide
1. Create a Progress Field
Entry: Tap the header → Edit → Field Type → Progress
- Tap the header you want to set.
- In the floating toolbar, tap Edit.
- In the field editing window, tap Field Type.
- Select Progress.
- Set the field name, then tap Confirm to finish.
Success Criteria
- On-screen result: A new Progress field column appears in the table.
- What you can do next: You can continue entering or adjusting progress values in that field.
Tips While Using
- Use a clear field name such as Task Progress or Completion Rate.
- You need edit permission for the current table to change the field type.
2. Update Progress Status
Entry: Tap the header → Edit → Progress field
- Tap the related header.
- In the floating toolbar, tap Edit.
- In the Progress field, enter a value or drag the progress bar to adjust it.
- After the adjustment, tap Confirm in the upper-right corner to save.
Success Criteria
- On-screen result: The progress bar length changes with the value.
- What you can do next: You can continue updating progress for other records.
Tips While Using
- Both direct value entry and dragging the progress bar can update status.
- Confirm the change right away so the edit is saved before leaving the panel.