When using WORKDAY, the most common questions involve parameter format, unexpected results, and business use methods; this FAQ covers 3 frequent questions and includes a glossary for quick review.
FAQ
What should I check first if WORKDAY returns an error?
- First, check whether the start date is a valid date type.
- Then check whether the working-day offset is a valid numeric value.
- If you used holiday parameters, confirm that those values are also valid dates.
- Finally, check that the parentheses, separators, and parameter order are complete.
Can WORKDAY be used with other functions?
- Yes. WORKDAY works well with other formula logic.
- You can generate the start date or day count from other fields first, then pass that result into WORKDAY.
- Save the formula and confirm that the returned date matches your business expectation.
Why is the result different-from-a-calendar-day-calculation?
- WORKDAY calculates working days, so weekends are not counted in the result.
- If holiday parameters are set, those dates are excluded as well.
- Because of that, the result is often later than a direct calendar-day addition.
Glossary
| Term | Definition |
|---|---|
| WORKDAY | A function used to calculate dates by working days, moving forward or backward from a start date. |
| Formula field | A field type in Multi-Dimensional Tables that generates results automatically from a function or expression. |
| Holiday parameter | An optional date parameter in WORKDAY used to exclude specific non-working days. |