Common questions about WPS Gantt View Grouping usually focus on timeline display, grouping levels, and returning to the default view. This section includes 3 frequent questions and a glossary.
FAQ
Does grouping change the Gantt timeline?
- No.
- Grouping only changes how task bars are arranged on screen.
- Task dates and timeline settings stay the same, so you can continue reviewing the schedule as planned.
Can I group by more than one field at the same time?
- Yes.
- After you add multiple grouping conditions, the view groups tasks in the order you set.
- This creates a multi-level grouping structure for layered task review.
Does removing grouping affect the original data?
- No.
- Removing grouping only clears the current display method.
- Task records, field values, and schedule data are not modified or deleted.
Glossary
| Term | Definition |
|---|---|
| Gantt view | A view that shows task timing and schedule relationships on a timeline. |
| Grouping condition | A field-based rule used to organize how tasks are displayed, such as status, owner, or category. |
| Multi-level grouping | A layered task display structure created by grouping with more than one field. |