WPS Gantt View Grouping on Android FAQ

Last updated:July 22, 2026

Common questions about WPS Gantt View Grouping usually focus on timeline display, grouping levels, and returning to the default view. This section includes 3 frequent questions and a glossary.

FAQ

Does grouping change the Gantt timeline?

  1. No.
  2. Grouping only changes how task bars are arranged on screen.
  3. Task dates and timeline settings stay the same, so you can continue reviewing the schedule as planned.

Can I group by more than one field at the same time?

  1. Yes.
  2. After you add multiple grouping conditions, the view groups tasks in the order you set.
  3. This creates a multi-level grouping structure for layered task review.

Does removing grouping affect the original data?

  1. No.
  2. Removing grouping only clears the current display method.
  3. Task records, field values, and schedule data are not modified or deleted.

Glossary

TermDefinition
Gantt viewA view that shows task timing and schedule relationships on a timeline.
Grouping conditionA field-based rule used to organize how tasks are displayed, such as status, owner, or category.
Multi-level groupingA layered task display structure created by grouping with more than one field.