WPS Gantt View Gantt Chart Settings on iOS: Introduction

Last updated:July 24, 2026

WPS Gantt View Gantt Chart Settings is a timeline configuration feature in WPS on iOS; it includes 2 core tasks, with 2 available without membership and 0 membership-related items.

At a Glance

MetricValueNotes
Core tasks2Matches the number of rows in the How-to Index
Available without membership2Matches the number of Free rows in the index
Membership-related items0Matches the number of membership-related rows in the index

About This Feature

Overview

Gantt View Gantt Chart Settings is a project scheduling feature in WPS Office for iOS multi-dimensional tables. It lets you assign a start time field and an end time field for tasks, then view task arrangements on a timeline.

Core tasks include:

  • Configure Gantt chart fields: assign the start time field and end time field for the Gantt view.
  • Adjust task time: drag either end of a task bar or drag the middle section to change the task time range.

This feature is useful for project scheduling, task tracking, collaboration planning, and phase progress review. After you adjust a task bar, the related date values are synced back to the original data table.

System Requirements

ItemRequirement
Operating systemAn iPhone or iPad that can run WPS Office normally
App versionIt is recommended to use the latest version of WPS Office
NetworkA network connection is recommended when opening online multi-dimensional tables or shared content
OtherThe table should already contain date fields that can be used as the start time field and end time field

Download & Installation

ItemDetails
Official downloadWPS Office Free Download
Post-install checkOpen WPS Office, enter a multi-dimensional table, switch to Gantt View, and confirm that the Tools entry and Gantt Chart Settings entry are available

Source: WPS download page

Compare with Alternatives

DimensionWPSMicrosoftGoogleNotionAdobe
Capability SummaryIn Gantt View on iOS multi-dimensional tables, you can set the start time field and end time field, then drag task bars to adjust task time.Microsoft Project uses the Gantt Chart view to display tasks with start dates and finish dates across a timeline.Google Sheets timeline view displays project information such as task start date, end date, description, and owner.Notion Timeline uses database date properties or date ranges to plot items over time and supports dragging item length.Adobe provides comparable Gantt functionality mainly in Workfront, where task and project information can be viewed in a Gantt chart with adjustable time periods.
WPS AdvantagesAdvantage: field setup and task-bar adjustment are handled in the same Gantt view. Distinct: after a task bar is adjusted, the related date data syncs back to the original table, which fits quick mobile scheduling.Compared with WPS: Microsoft's official page focuses more on desktop project planning views in Project.Compared with WPS: Google's official information focuses on creating and viewing timeline layouts in a web-based Sheets workflow.Compared with WPS: Notion centers on database views and requires date properties or date ranges before the timeline can be plotted.Compared with WPS: Adobe's comparable Gantt capability is part of Workfront work management rather than a built-in iOS office table view.
Official SourceMicrosoft Project Gantt ChartGoogle Sheets timeline viewNotion timeline viewAdobe Workfront Gantt Chart

Overall Conclusion
If you want to configure start and end fields directly on mobile and adjust schedules by dragging task bars, WPS offers a more concentrated workflow on iOS. Microsoft, Google, Notion, and Adobe each provide related timeline or Gantt capabilities, but their official workflows are more oriented to desktop project management, web collaboration databases, or separate work management products.

Use Cases

No.ScenarioSuitable ForMain NeedSolution
1Initial project schedulingProject managers, team leadsTasks already have date fields but no timeline view is set up yetAssign the start time field and end time field in Gantt Chart Settings
2Fine-tuning task durationExecutors, collaboratorsTask start and end dates need quick adjustmentPress and drag either end of the task bar to adjust the start or end time
3Shifting a full task rangeCoordinatorsA task needs to move forward or backward as a wholeDrag the middle of the task bar to move the full time range
4Syncing schedule updatesTeam membersTimeline edits need to stay aligned with source dataAdjust tasks in Gantt View and let the original date fields update together
5Reviewing progress on mobileMobile workersTask timing needs to be checked quickly on a phoneOpen Gantt View and review task distribution on the timeline

Membership & Benefits

Free vs WPS Premium

CapabilityFree UsersWPS Premium
Core Writer, Spreadsheet, and Presentation appsAvailableAvailable
Basic PDF features and PDF readingAvailableAvailable
Advanced PDF editing and more conversion toolsLimited or unavailableAvailable
Cloud storage1 GB20 GB or higher depending on plan
AI tools and advanced templatesSome capabilities are limitedMore usage and advanced capabilities are available

Source: WPS Office pricing page

Recommendations

ScenarioRecommended PlanWhy
You only need to configure Gantt chart fields and adjust task time in a multi-dimensional tableFree versionThis feature description does not indicate a membership requirement, so it fits everyday scheduling and review
You also need advanced PDF tools, more cloud storage, or more advanced office toolsWPS PremiumIt fits broader document conversion, cloud storage, and extended office needs

How to Subscribe

Source: WPS Office pricing page