This section includes 3 how-to topics for NETWORKDAYS, covering basic formula entry, cell-based date references, and combined formula use; choose a topic from the index and follow the steps.
How-to Index
| No. | Topic | Membership Requirement |
|---|---|---|
| 1 | 1. Enter a basic NETWORKDAYS formula | Free |
| 2 | 2. Calculate workdays with date cell references | Free |
| 3 | 3. Combine NETWORKDAYS with other formulas | Free |
How-to Guide
1. Enter a basic NETWORKDAYS formula
Entry point: Open a worksheet in WPS Spreadsheets and type the formula directly in the target cell.
- Open a spreadsheet file and select the cell where you want the result to appear.
- Type
=NETWORKDAYS(. - Enter the start date and end date, for example
=NETWORKDAYS("2026-07-01","2026-07-10"). - Type the closing parenthesis and press Enter.
- Check the returned workday result in the cell.
Success Criteria
- The cell returns a numeric result.
- The formula bar shows the full NETWORKDAYS formula.
- The result recalculates after you change the dates.
Tips While Using
- Use recognizable date formats for the date arguments.
- If the result looks incorrect, check whether the start date and end date were entered correctly.
2. Calculate workdays with date cell references
Entry point: Type a formula with referenced cells in the result cell.
- Enter the start date and end date in worksheet cells.
- Select the result cell.
- Type a formula such as
=NETWORKDAYS(A2,B2). - Press Enter to confirm.
- Change the date in A2 or B2 and review the updated result.
Success Criteria
- The result cell shows the number of workdays.
- The result updates when the referenced dates change.
Tips While Using
- Referenced cells should contain date values rather than plain text.
- Setting the date columns to a date format can reduce recognition errors.
3. Combine NETWORKDAYS with other formulas
Entry point: Enter a combined formula in the formula bar or target cell.
- Decide what extended scenario you need, such as conditional logic or result grouping.
- Enter the combined formula in the target cell.
- For example, calculate workdays with NETWORKDAYS first, then use IF or another formula for classification.
- Press Enter to confirm the formula.
- Adjust the arguments based on your data and review the result.
Success Criteria
- The combined formula returns a valid result.
- The NETWORKDAYS result can be used in later formula logic.
Tips While Using
- If the formula is long, check each argument step by step.
- If an error appears, test the NETWORKDAYS part separately first.