WORKDAY in WPS on Windows: Introduction

Last updated:July 14, 2026

WPS WORKDAY on Windows helps you return the date before or after a specified number of working days; this guide covers 3 core tasks, with 3 available without membership and 0 membership-related items.

At a Glance

MetricValueNotes
Core tasks3Matches the number of rows in the How-to Index
Available without membership3Matches the number of Free rows in the index
Membership-related items0Matches the number of membership-related rows in the index
Version limitsNone specifiedUse it in the current WPS Sheets environment on Windows

About This Feature

Overview

The WORKDAY function in WPS Sheets is a date calculation tool for spreadsheet work. It returns a date before or after a specified number of working days, excluding weekends and optionally excluding holidays.

Core tasks include:

  • Insert the WORKDAY function from the Insert Function dialog box.
  • Type =WORKDAY(...) directly in a cell or in the formula bar.
  • Review the syntax WORKDAY(start_date, days, [holidays]) and its arguments.

This function is useful for project scheduling, delivery date planning, attendance tracking, and other spreadsheet workflows that need working-day calculations.

System Requirements

ItemRequirement
OSA Windows device that can run WPS Office
App versionIt is recommended to use the latest version of WPS Office
NetworkNo required internet connection for local formula entry; internet is needed for online help or software download
OtherWPS Sheets must be installed, and you need an editable spreadsheet file

Download & Installation

ItemNotes
Official DownloadWPS Office Free Download
Post-install CheckOpen WPS Sheets, then open the Formulas tab and confirm that options such as Insert Function are available

Source: WPS Download Center

Compare with Alternatives

DimensionWPSMicrosoftGoogleNotionAdobe
Capability SummaryProvides the WORKDAY function to return the date before or after a specified number of working days, with optional holiday exclusions.Excel provides the WORKDAY function with the syntax WORKDAY(start_date, days, [holidays]) for dates that exclude weekends and holidays.Google Sheets provides the WORKDAY function with the syntax WORKDAY(start_date, num_days, [holidays]) to calculate the end date after a specified number of working days.Notion formulas support date functions such as dateAdd, dateSubtract, and dateBetween, but there is no spreadsheet-style WORKDAY function with the same name.Adobe Acrobat focuses on PDF editing, conversion, and signing, and its official product page does not describe a spreadsheet function equivalent to WORKDAY.
WPS AdvantagesAdvantage: You can calculate working-day dates directly in a familiar spreadsheet formula workflow through Insert Function or direct formula entry, and the function itself is available without membership.Compared with WPS: It offers a comparable function for Excel workbook workflows.Compared with WPS: It offers a comparable function, but Google also notes date-format handling details for direct entry.Compared with WPS: Date logic is possible through formula combinations, but the workflow is centered on database properties rather than traditional spreadsheet formulas.Compared with WPS: It is better suited to PDF document workflows instead of spreadsheet date calculations.
Official SourceWORKDAY functionWORKDAYFormula syntax and functionsAdobe Acrobat

Overall Conclusion

If most of your work happens in spreadsheets, WPS, Microsoft Excel, and Google Sheets all provide similar working-day date calculations. WPS fits well when you want a familiar spreadsheet formula workflow in WPS Sheets, while Notion and Adobe are better aligned with database and PDF-focused workflows.

Use Cases

#ScenarioTarget UsersCore Pain PointSolution
1Project delivery schedulingProject managers and operations staffNeed to estimate completion dates without counting weekendsUse WORKDAY to return a target date from a start date and a number of working days
2Attendance and leave trackingHR and administrative staffNeed date calculations based on working-day rulesEnter WORKDAY in a sheet and combine it with a holiday range
3Purchasing and shipping plansPurchasing and supply chain staffNeed to estimate due dates after several working daysUse Insert Function to fill in arguments and generate the date
4Finance due-date managementFinance staffPayment terms cannot always follow calendar daysUse WORKDAY to exclude weekends and holidays when calculating due dates
5Everyday spreadsheet automationGeneral office usersManual working-day calculations are easy to get wrongType the formula directly in cells for batch calculation

Membership & Benefits

Free vs WPS Premium

FeatureFree UserWPS Premium
Basic WPS Sheets functions
WORKDAY formula entry and calculation
Some advanced PDF, AI, and extended toolsBasic or limited access as described on the pricing pageMore advanced tools and higher usage allowances
Cloud storage1 GBSee the current plan details on the pricing page

Source: WPS Office pricing page

Recommendations

Use CaseRecommended PlanReason
Everyday spreadsheet date calculationsFreeThe WORKDAY function itself is available for regular spreadsheet work
Users who also need more PDF, template, or extended office toolsWPS PremiumBetter suited to users who need broader advanced office features

How to Subscribe

Source: WPS Office pricing page